WRONG PIPES INSTALLED AT BART BERRYESSA STATION
When an NBC Bay Area Investigative Unit discovered that the BART extension from East Bay to San Jose had installed cast iron pipe instead of PCV pipe, ASU’s Professor Samuel Ariaratnam, chair of SSEBE’s construction engineering program, was consulted about the significance of the mistake. (Video no longer available.)